Clackamas County logoClackamas County

Standard Sewer Specifications

Table of Contents

APRIL, 1981
REVISED September 1994

SECTION 1 TRENCH EXCAVATION AND BACKFILL
  • 1-A Scope
  • 1-B Materials
    • 1-B-1 Trench Excavation
      • (a) Common Excavation
      • (b) Rock Excavation
      • (c) Boulder Removal
    • 1-B-2 Trench Backfill
      • (a) Foundation Stabilization
      • (b) Crushed Gravel Pipe Base
      • (c) Gravel for Trench Backfill
      • (d) Bituminous Cements
      • (e) Asphaltic Concrete
      • (f) Crushed Gravel
      • (g) Controlled Density Fill
  • 1-C Workmanship
    • 1-C-1 Clearing the Right-of-Way
    • 1-C-2 Obstructions
    • 1-C-3 Asphaltic Concrete Pavement Removal and Replacement
    • 1-C-4 Blasting
    • 1-C-5 Trench Width
    • 1-C-6 Grade
    • 1-C-7 Shoring, Sheeting and Grading of Trenches
    • 1-C-8 Location of the Excavated Materials
    • 1-C-9 Removal of Water
    • 1-C-10 Foundation Stabilization
    • 1-C-11 Trench Backfill at Pipe Zone
    • 1-C-12 Trench Backfill Compaction
    • 1-C-13 Trench Backfill above Pipe Zone
      • (a) Class "A" Backfill
      • (b) Class "B" Backfill
      • (c) Class "C" Backfill
      • (d) Class "D" Backfill
    • 1-C-14 Excess Excavated Material
    • 1-C-15 Rock Excavation
    • 1-C-16 Controlled Density Fill
  • 1-D Measurement and Payment
    • 1-D-1 Clearing and Grubbing
    • 1-D-2 Trench Excavation and Backfill
    • 1-D-3 Foundation Stabilization
    • 1-D-4 Asphaltic Concrete Pavement Replacement
    • 1-D-5 Rock Excavation
    • 1-D-6 Boulder Removal
    • 1-D-7 Controlled Density Fill

SECTION 2 SEWER PIPE INSTALLATION

  • 2-A Scope
  • 2-B Materials
    • 2-B-1 PVC Sewer Pipe
      • (a) Pipe Requirements
      • (b) Installation Requirements
      • (c) Use Restrictions
    • 2-B-2 Concrete Pipe and Fittings
    • 2-B-3 Ductile Iron Pipe and Fittings
  • 2-C Workmanship
    • 2-C-1 Preparation of Trench
      • (a) Crushed Gravel Pipe Base
      • (b) Bell Holes
      • (c) Removal of Water
    • 2-C-2 Preparation of Sewer Pipe
    • 2-C-3 Laying and Jointing Pipe and Fittings
      • (a) Line and Grade
      • (b) Sewer Installation
        • (1) Main Sewers
        • (2) Service Connections
      • (c) Testing of Sewer Pipe
        • (1) General
        • (2) Testing Procedures
        • (3) Acceptance of Test
        • (4) Safety Provisions
        • (5) Alternate Water Exfiltration Test
        • (6) Other Test Allowances
        • (7) Manhole Water Test Allowances
        • (8) Manhole Vacuum Test
        • (9) Subsequent Failure
      • (d) Waterline Crossings
  • 2-D Measurement and Payment
    • 2-D-1 Sewer Pipe and Crushed Gravel Pipe Base
    • 2-D-2 Service Connection Tees and Wyes

SECTION 3 MANHOLE AND CLEANOUT CONSTRUCTION

  • 3-A Scope
  • 3-B Materials
    • 3-B-1 Concrete
    • 3-B-2 Precast Manhole Sections
    • 3-B-3 Precase Concrete Bases
    • 3-B-4 Mortar
    • 3-B-5 Manhole Extensions
    • 3-B-6 Special Fittings
    • 3-B-7 Manhole and Cleanout Frames and Covers
    • 3-B-8 Manhole Steps
    • 3-B-9 Manhole Blockouts
  • 3-C Workmanship
    • 3-C-1 Concrete Base
    • 3-C-2 Placing Precast Manhole Sections
    • 3-C-3 Manhole Inverts
    • 3-C-4 Manhole and Cleanout Rings and Covers
    • 3-C-5 Manhole Extensions
    • 3-C-6 Drop Manholes
    • 3-C-7 Cleanouts
  • 3-D Measurement and Payment
    • 3-D-1 Standard and Drop Manholes
    • 3-D-2 Cleanouts

SECTION 4 LAWNS AND GRASS RESTORATION ON EASEMENTS

  • 4-A Scope
  • 4-B Materials
    • 4-B-1 Fertilizer (Grass Areas)
    • 4-B-2 Fertilizer (Lawn Areas)
    • 4-B-3 Straw Mulch
    • 4-B-4 Seed
  • 4-C Workmanship
    • 4-C-1 Seeding
    • 4-C-2 Soil Preparation
    • 4-C-3 Seeding and Fertilizing (Grass Areas)
    • 4-C-4 Seeding and Fertilizing (Lawn Areas)
    • 4-C-5 Mulching and Protection
    • 4-C-6 Maintenance Period
    • 4-C-7 Maintenance Operations (Lawn Areas)
    • 4-C-8 Maintenance Operations (Grass Areas)
    • 4-C-9 Grass and Lawn Guarantee
  • 4-D Payment
    • 4-D-1 Grass
    • 4-D-2 Lawns

LIST OF DETAIL DRAWINGS

Description of Drawing File Name
Class "A" Excavation & Backfill san-001 PDF AUTOCAD
Class "B" Excavation & Backfill san-002 PDF AUTOCAD
Class "C" Excavation & Backfill san-003 PDF AUTOCAD
Class "D" Excavation & Backfill san-004 PDF AUTOCAD
AC Pavement Replacement san-005 PDF AUTOCAD
Typ. Concrete Anchor Block san-006 PDF AUTOCAD
Typical Manhole san-007 PDF AUTOCAD
Typical Flattop Manhole san-008 PDF AUTOCAD
Typical Drop Manhole san-009 PDF AUTOCAD
Secure Manhole Detail san-010 PDF AUTOCAD
Precast Manhole Base san-011 PDF AUTOCAD
Flexible Manhole Connection san-012 PDF AUTOCAD
Precast Ring Extension san-013 PDF AUTOCAD
Typ. Manhole - 24" TP 48" Pipe san-014 PDF AUTOCAD
Falls Less Than 2" san-015 PDF AUTOCAD
Channel Intersection san-016 PDF AUTOCAD
Building Sewer san-017 PDF AUTOCAD
Clean Out san-018 PDF AUTOCAD
Service Connection into Manholes san-019 PDF AUTOCAD
90 Degree MH Channel san-020 PDF AUTOCAD