
WES Home
Contact Us
About WES
Calendar
Outreach & Education
Rules & Specifications
Bids & RFPs
Forms
Frequently Asked Questions
North Clackamas Revitalization Area
Clackamas County Service District No. 1
Tri-City Service District
Surface Water Management Agency of Clackamas County
Contact Us
About WES
Calendar
Outreach & Education
Rules & Specifications
Bids & RFPs
Forms
Frequently Asked Questions
North Clackamas Revitalization Area
Clackamas County Service District No. 1
Tri-City Service District
Surface Water Management Agency of Clackamas County
CCSD#1 Surface Water Standard Specifications
Table of Contents
JULY 24, 2001
- SECTION 1 TRENCH EXCAVATION AND BACKFILL
- 1-A Scope
- 1-B Materials
- 1-B-1 Trench Excavation
- (a) Common Excavation
- (b) Rock Excavation
- (c) Boulder Removal
- 1-B-2 Trench Backfill
- (a) Foundation Stabilization
- (b) Geotextile Fabric
- (c) Crushed Gravel Pipe Base
- (d) Gravel for Trench Backfill
- (e) Bituminous Cements
- (f) Asphaltic Concrete
- (g) Crushed Gravel
- (h) Controlled Density Fill
- 1-B-1 Trench Excavation
- 1-C Workmanship
- 1-C-1 Clearing the Right-of-Way
- 1-C-2 Obstructions
- 1-C-3 Asphaltic Concrete Pavement Removal and Replacement
- 1-C-4 Blasting
- 1-C-5 Trench Width
- 1-C-6 Grade
- 1-C-7 Shoring, Sheeting and Grading of Trenches
- 1-C-8 Location of the Excavated Materials
- 1-C-9 Removal of Water
- 1-C-10 Foundation Stabilization
- 1-C-11 Trench Backfill at Pipe Zone
- 1-C-12 Trench Backfill Compaction
- (a) Mechanical Compaction
- 1-C-13 Trench Backfill above Pipe Zone
- (a) Class "A" Backfill
- (b) Class "B" Backfill
- (c) Class "C" Backfill
- (d) Class "D" Backfill
- 1-C-14 Excess Excavated Material
- 1-C-15 Rock Excavation
- 1-C-16 Controlled Density Fill
- (a) General
- (b) Placement
- (c) Curing
- 1-D Measurement and Payment
- 1-D-1 Clearing and Grubbing
- 1-D-2 Trench Excavation and Backfill
- 1-D-3 Foundation Stabilization
- 1-D-4 Asphaltic Concrete Pavement Replacement
- 1-D-5 Rock Excavation
- 1-D-6 Boulder Removal
- 1-D-7 Controlled Density Fill
- 2-A Description
- 2-A-1 Tunneling
- 2-A-2 Boring
- 2-A-3 Jacking
- 2-B Materials
- 2-B-1 Pipe Bedding and Pipe Zone Material
- 2-B-2 Pipe
- 2-B-3 Casing
- 2-B-4 Grout
- 2-C Construction
- 2-C-1 General
- 2-C-2 Excavation
- 2-C-3 Tunneling Details Required
- 2-C-4 Jacking and Boring Details Required
- 2-C-5 Tunneling
- 2-C-6 Jacking and Boring
- 2-C-7 Concrete Pipe and Box Sections
- 2-C-8 Smooth Steel Casing
- 2-C-9 Grouting Voids Outside Casing
- 2-C-10 Cased or Tunneled Pipe
- 2-C-11 Placing Fill in Casing
- 2-C-12 Railroad Crossings
- 2-D Measurement and Payment
- 2-D-1 Tunneling, Boring and Jacking
- 2-D-2 Tees and Wyes
- 3-A Scope
- 3-B Materials
- 3-B-1 Concrete Pipe and Fittings
- 3-B-2 Ductile Iron Pipe and Fittings
- 3-B-3 PVC Storm Drain
- (a) Pipe Requirements
- (b) Installation Requirements
- (c) Gaskets
- (d) Use Restrictions
- 3-B-4 High Density Polyethylene Pipe (HDPE)
- 3-B-5 Polyethylene (PE) (Smooth wall)
- 3-B-6 Corrugated Polyethylene (CPP)
- 1. Pipe Requirements
- 3-B-7 Metal Pipe
- 3-B-8 Coatings
- (a) Bituminous
- 3-B-9 Jointing Materials
- a. Concrete Pipe
- b. Cast Iron and Ductile Iron Pipe
- c. PVC Pipe
- d. HDPE Pipe
- 3-B-10 Fittings
- a. PVC Pipe
- b. Corrugated Pipe
- c. Concrete Pipe
- d. Ductile Iron
- e. Transition Fittings
- 3-C Workmanship
- 3-C-1 Preparation of Trench
- (a) Crushed Gravel Pipe Base
- (b) Perforated Pipe Underdrains
- (c) Bell Holes
- (d) Removal of Water
- 3-C-2 Preparation of Storm Drain Pipe
- 3-C-3 Laying and Jointing of Pipe and Fittings
- (a) Line and Grade
- (b) Storm Drain Installation
- (1) Main Storm Drain
- (2) Perforated Pipe
- (3) Service Connections
- (c) Testing of Storm Drain Pipe & Appurtenances
- (1) General
- (2) Cleaning Prior to Testing and Acceptance
- (3) Repairs
- (4) Deflection Test for PVC and HDPE Pipe
- (5) Television Inspection of Storm Drains
- 3-C-1 Preparation of Trench
- 3-D Measurement and Payment
- 3-D-1 Storm Drain Pipe and Crushed Gravel Pipe Base
- 3-D-2 Service Connection Tees and Wyes
- 4-A Scope
- 4-B Materials
- 4-B-1 Concrete
- 4-B-2 Precast Manhole Sections
- 4-B-3 Precast Concrete Bases
- 4-B-4 Mortar
- 4-B-5 Manhole Extensions
- 4-B-6 Special Fittings
- 4-B-7 Manhole and Cleanout Frames and Covers
- 4-B-8 Manhole Steps
- 4-B-9 Precast Inlets and Catch Basins
- 4-B-10 Cap Screws
- 4-B-11 Standard Frames & Grates for Inlets & Catch Basins
- 4-B-12 Storm Sumps
- 4-C Workmanship
- 4-C-1 Concrete Base
- 4-C-2 Placing Precast Manhole Sections
- 4-C-3 Manhole Inverts
- 4-C-4 Manhole and Cleanout Rings and Covers
- 4-C-5 Manhole Extensions
- 4-C-6 Drop Manholes
- 4-C-7 Cleanouts
- 4-C-8 Installation of Inlets and Catch Basins
- 4-C-9 Foundation Stabilization
- 4-C-10 Inlet and Catch Basin Extensions
- 4-C-11 Cleaning
- 4-D Work on Existing Storm Drainage Structures
- 4-D-1 Standard and Drop Manholes
- 4-D-2 Cleanouts
- 4-D-3 Removal of Existing Pipes, Manholes & Appurtenances
- 4-D-4 Filing Abandoned Manholes, Inlets & Catch Basins
- 4-D-5 Existing Manhole Frames & Covers
- 4-D-6 Permanent Plugs
- 4-D-7 Adjust Existing Structures to Grade
- 4-D-8 Reconstruct Manhole Base
- 4-D-9 Connect Pipe to Existing Inlets
- 4-D-10 Storm Sump Protection
- 4-E Measurement and Payment
- 4-E-1 Standard and Drop Manholes
- 4-E-2 Cleanouts
- 4-E-3 Catch Basins and Inlets
- 4-E-4 Storm Sumps
- 4-E-5 Manholes Over Existing Storm Drains
- 4-E-6 Removal of Existing Pipes, Manholes & Appurtenances
- 4-E-7 Connection to Existing Manholes
- 4-E-8 Filling Abandoned Manholes, Inlets and Catch Basins
- 4-E-9 Adjust Existing Structures to Grade
- 4-E-10 Reconstruct Manhole Base
- 4-E-11 Connect Pipe to Existing Catch Basin
- 4-E-12 Storm Sump Protection
- 5-A Scope
- 5-B Materials
- 5-B-1 Fertilizer (Grass Areas)
- 5-B-2 Fertilizer (Lawn Areas)
- 5-B-3 Straw Mulch
- 5-B-4 Seed
- 5-C Workmanship
- 5-C-1 Seeding
- 5-C-2 Soil Preparation
- 5-C-3 Seeding and Fertilizing (Grass Areas)
- 5-C-4 Seeding and Fertilizing (Lawn Areas)
- 5-C-5 Mulching and Protection
- 5-C-6 Maintenance Period
- 5-C-7 Maintenance Operations (Lawn Areas)
- 5-C-8 Maintenance Operations (Grass Areas)
- 5-C-9 Grass and Lawn Guarantee
- 5-D Payment
- 5-D-1 Grass
- 5-D-2 Lawns
- 6-A GENERAL
- 6-A-1 DESCRIPTION
- 6-A-2 RELATED WORK SPECIFIED ELSEWHERE
- 6-A-3 PERMITS
- 6-A-4 SUBMITTALS FOR PRECONSTRUCTION MEETING
- 6-B EXECUTION
- 6-B-1 GENERAL
- 6-B-2 CONSTRUCTION DETAILS
- 6-B-3 MONITORING AND REPORTING REQUIREMENTS
SECTION 2 TUNNELING, BORING, JACKING
SECTION 3 STORM DRAIN PIPE INSTALLATION
SECTION 4 MANHOLE, INLET, CATCH BASIN, AND CLEANOUT CONSTRUCTION
SECTION 5 LAWNS AND GRASS RESTORATION ON EASEMENTS
SECTION 6 EROSION CONTROL
Appendixes
Appendix A - Submittal Requirements for Surface Water Management
Appendix B - Specification for Computer-Aided Drafting
Appendix C - Standard Details
Appendix D - Accepted Stormwater Quality Facilities Design Criteria
Appendix E - Areas with Known Downstream Conveyance Restrictions
Appendix F – Detention Access Standards
LIST OF DETAIL DRAWINGS
| Description of Drawing | File Name |
| Standard Catchbasin | swm-0001 PDF AutoCad |
| Trapped Catchbasin | swm-0002 PDF AutoCad |
| Flow Thru Catchbasin | swm-0003 PDF AutoCad |
| Curb Inlet Catchbasin | swm-0004 PDF AutoCad |
| GB-2 Grate | swm-0005 PDF AutoCad |
| Standard Ditch Inlet | swm-0006 PDF AutoCad |
| GB-2 Grate Frame | swm-0007 PDF AutoCad |
| Typical Manhole | swm-0008 PDF AutoCad |
| Flattop Manhole | swm-0009 PDF AutoCad |
| Flow Control Manhole | swm-0010 PDF AutoCad |
| Pollution Manhole | swm-0011 PDF AutoCad |
| Pollution Control Baffle | swm-0012 PDF AutoCad |
| Sedimentation Manhole | swm-0013 PDF AutoCad |
| Pollution Manhole & Drywell | swm-0014 PDF AutoCad |
| Drywell | swm-0015 PDF AutoCad |
| Underground Detention | swm-0016 PDF AutoCad |
| Precast Manhole Base | swm-0017 PDF AutoCad |
| Precast Ring Extension | swm-0018 PDF AutoCad |
| Manhole Covers | swm-0019 PDF AutoCad |
| Secure Manhole Detail | swm-0020 PDF AutoCad |
| Flexible Manhole Connection | swm-0021 PDF AutoCad |
| Storm Collection System | swm-0022 PDF AutoCad |
| Utility Location | swm-0023 PDF AutoCad |
| Storm Lateral Service | swm-0024 PDF AutoCad |
| Clean Out | swm-0025 PDF AutoCad |
| A.C. Pavement Replacement Detail | swm-0026 PDF AutoCad |
| Class "A" Excavation & Backfill | swm-0027 PDF AutoCad |
| Class "B" Excavation & Backfill | swm-0028 PDF AutoCad |
| Class "C" Excavation & Backfill | swm-0029 PDF AutoCad |
| Class "D" Excavation & Backfill | swm-0030 PDF AutoCad |
| PVC Gasketed Saddle | swm-0031 PDF AutoCad |
| Bore Casing Detail | swm-0032 PDF AutoCad |
| Culvert & Storm Sewer Outlet | swm-0033 PDF AutoCad |
| Anchor Wall | swm-0034 PDF AutoCad |
| Surface Water Facility Sign | swm-0035 PDF AutoCad |
| Detention Pond | swm-0036 PDF AutoCad |
| Constructed Wetland | swm-0037 PDF AutoCad |
| Pond/Swale Section | swm-0038 PDF AutoCad |



